Products
Red Mud Biogas Cover for Wate Water Treatment
Red Mud Biogas Cover for Waste Water Treatment Q uick details of red mud biogas cover for waste water treatment Advantages of red mud biogas cover for waste water treatment Since 2006 , we have 10 years′ experience of development, design, production, processing and application; Excellent...
Features
Sichuan Mondes Green Technology Co., Ltd. is one of the leading red mud biogas cover for wate water treatment manufacturers and suppliers in China. Please feel free to buy customized red mud biogas cover for wate water treatment at competitive price from our factory. Contact us for more details.
Red Mud Biogas Cover for Waste Water Treatment
Quick details of red mud biogas cover for waste water treatment
| Item Name | Red Mud Biogas Cover for Waste Water Treatment |
Model | MDS1000 |
Material | PVC Membrane |
Features | Water-proof, Acid-resistant |
use | Gas Storage and transportation |
Custom Desigh | Welcome |
Form of sale | Factory supply |
MOQ | 1set |
Thickness | 0.50mm-1.80mm |
Sample Lead Time | 10~25 Days |
Sample price | According to the order capacity |
OEM,ODM | Welcome |
Market | All over the world |
Advantage | OEM/ODM |
Payment Terms | 30% advance payment, the rest payment before delivery |
Advantages of red mud biogas cover for waste water treatment
Since 2006, we have 10 years′ experience of development, design, production, processing and application;
Excellent tensile, tearing, and adhesion strength;
- UV protection, antibacterial and anti-mildew, anti-fouling and anti-corrosion;
- High temperature and cold proof, aging resistance and durable;
- Surface treatment: acrylic or PVDF;
- Service life is more than 10 years;
- It can be used in biogas storage tank, biogas fermentation bag, biogas slurry storage bag, the tent of biogas slurry treatment factory.
Quality service and warranty of red mud biogas cover for waste water treatment
100% quality testing for every finished product before delivery;
Professional Aging testing room for aging testing time over 8 hours
Professional function testing for every process
One year warranty service for whole set equipment.
to repair the membrane for free within 3 years.
Delivery Service of red mud biogas cover for waste water treatment
- The product will leave factory within 15-30 days after receipt of your advance payment
- Export standard, safety and environmental packing Quick lead time for mass production.
- Accept EXW, FOB, CIF and other price terms
Pricing of red mud biogas cover for waste water treatment
Pricing varies depending on capacity required, operating pressure and gas production and utilization rates. Quotations are provided within 48 hours of request when accompanied by minimum required specification data.
Minimum specification data required in order to provide a quote:
- Required Gas Storage Capacity (m³)
- Operating Pressure (Kpa or mbar)
- Gas Production & Utilization rates (m³/hr)
Hot Tags: red mud biogas cover for wate water treatment, China, suppliers, manufacturers, customized, Red Mud Biogas Cover, Red Mud Biogas Cover For Biogas Plant, Red Mud Biogas Cover For Biogas Storage, Red Mud Biogas Cover For Farm, Red Mud Biogas Cover For Wate Water Treatment, Red Mud Biogas Cover On Lagoon
You Might Also Like
Learn MoreGround-mounted Double Membrane Gas Holder
Learn MoreDual Membrane Gas Balloon on Digester
Learn MoreDual Membrane Gas Balloon for Biogas Plant
Learn MoreSphere Biogas Storage Tanks
Learn MoreDual Membrane Biogas Domes for Biogas Storage
Learn MoreBolted Steel Tanks for Potable Water Storage
Send Inquiry




